A smaller number can signal a major engineering achievement. It cannot tell you, on its own, which chip is more profitable, which factory will earn the best return, or which component will constrain the next wave of AI infrastructure.
Understanding the move towards 2 nm, 1.4 nm and eventually 1 nm requires three separate maps: the technology roadmap, the products using each process, and the market that pays for them. Those maps overlap, but they do not move in lockstep.
The useful question for investors is therefore broader than who reaches the smallest node first: where does a new process create enough economic value to justify moving to it?
What a node actually tells you
A process node is a manufacturing platform: its transistor architecture, interconnects, design rules and fabrication steps. Intel explains that modern node names represent generations of density or performance improvement more than literal physical dimensions. A “2 nm chip” does not consist of transistors whose every dimension measures two nanometres.
An ångström is one-tenth of a nanometre, so 18 Å converts to 1.8 nm as a unit of length. But Intel 18A, TSMC N2 and Samsung SF2 are distinct technologies. Their names do not establish an apples-to-apples ranking. Customers also evaluate performance, power, density, manufacturing yield and cost.
2 nm is commercial; 1 nm remains a future frontier
TSMC says N2 entered volume production in 2025. The supplied annual-report reference schedules N2P and A16 for the second half of 2026; that document could not be accessed in this review, so the precise schedule remains subject to verification. These milestones need careful interpretation: starting production, achieving attractive yields and generating a large revenue contribution are different stages.
| Platform | Evidence or stated timing | How to read it |
|---|---|---|
| TSMC N2 / 2 nm | Volume production began in 2025; 3% of wafer revenue in Q2 2026 | An operating business, still early in its revenue ramp. |
| Intel 18A | Panther Lake compute tile | A product implementation; not a claim that every die in its package uses 18A. |
| Samsung 2 nm GAA | Exynos 2600 product specification | A named mobile processor, not merely a roadmap target. |
| TSMC N2P / A16 | Second half of 2026 in the annual-report roadmap | A scheduled window; this article does not independently confirm the ramp. |
| TSMC A14 / 1.4 nm class | Production planned for 2028 | A future production target. |
| TSMC A13 / A12 | Production planned for 2029 | A13 shrinks A14; A12 adds backside power delivery. |
| 1 nm class | Research and future technology roadmaps | No commercially shipping 1 nm product verified for this article. |
TSMC’s published A14 targets illustrate what the next step is meant to deliver: up to 15% higher speed at the same power, or up to 30% lower power at the same speed, plus more than 20% higher logic density versus N2. The alternatives matter: these are not simultaneous gains to add together, and they are process targets rather than guaranteed improvements in a finished device.
The subsequent roadmap already has branches. TSMC’s A13 is a direct shrink of A14 with 6% area savings, while A12 brings backside power delivery to the platform. Both are scheduled for 2029. That is a more informative picture than a single descending sequence of node numbers.
For 1 nm, the responsible framing is a technology frontier. Imec’s research addresses the transistor, interconnect and lithography changes needed to keep scaling. A research demonstration or roadmap label is not proof of economical high-volume manufacturing. This article therefore assigns neither a firm commercial launch date nor a current market share to 1 nm.
Which chips actually use which nodes?
Specific products are more useful than blanket rules such as “AI uses 2 nm” or “cars use old chips.” The examples below are selected, manufacturer-documented implementations, not an exhaustive catalogue or a ranking of the newest products in each category.
| Node / process | Documented example | Chip function / scope |
|---|---|---|
| 2 nm | Apple A20 Pro | Mobile system-on-chip; Apple identifies a 2 nm process. |
| 2 nm GAA | Samsung Exynos 2600 | Mobile system-on-chip combining CPU, GPU and NPU. GAA means gate-all-around: a transistor architecture. |
| Intel 18A | Panther Lake | Compute tile in the Core Ultra Series 3 family. |
| 3 nm, second generation | Apple M4 | System-on-chip for personal computing. |
| TSMC 4NP | NVIDIA Blackwell | AI GPU built using two connected GPU dies. |
| TSMC 5 nm + 6 nm | AMD Ryzen 9 7950X | 5 nm CPU compute dies and a 6 nm I/O die in one desktop processor. |
| 7 nm | Second-generation AMD EPYC | Zen 2 CPU cores for servers; an established-generation example. |
| 22 nm FD-SOI | GlobalFoundries 22FDX | Manufacturing platform for applications including IoT and automotive; not one named chip. FD-SOI means fully depleted silicon-on-insulator. |
| 28–130 nm | Texas Instruments manufacturing portfolio | Analog and embedded process range; not a universal node for every TI product. |
AMD’s Ryzen 9 7950X makes the multi-node point concrete: its CPU cores use TSMC 5 nm, while its I/O die uses 6 nm. Assigning the entire package one node loses useful information about its design and manufacturing economics.
Blackwell is a useful counterexample to the assumption that a commercially important AI accelerator must use the smallest available node. NVIDIA specifies a custom TSMC 4NP process and two connected GPU dies—individual pieces of silicon within the product. Product architecture and integration belong in the analysis alongside manufacturing technology.
Memory has its own naming system
DRAM labels such as 1α, 1β and 1γ should not be placed on a logic-node chart as 1 nm. Micron describes 1α as a generation within the 10 nm class. High-bandwidth memory (HBM) is a stacked-memory technology and packaging arrangement, not one universal process node.
A further complication is the distinction between an HBM stack’s logic base and its memory dies. The supplied manuscript names TSMC N12 and N3 base dies for HBM4, but that specific mapping lacks a traceable primary-source reference and remains unverified in this draft.
The revenue mix tells a different story from the headlines
In Q2 2026, TSMC reported that 2 nm generated 3% of wafer revenue, compared with 30% for 3 nm, 33% for 5 nm and 11% for 7 nm. Together, 7 nm and smaller represented 77%. The remaining 23% came from the older categories shown below.
Q2 2026 · share of TSMC wafer revenue, not global market share or production volume
Reported Q2 2026
Source: TSMC · Q2 2026 Management Report, p. 2 ↗
Data table & CSV
| Category | Value (%) | Period | Status |
|---|---|---|---|
| 2 nm | 3% | Q2 2026 | Reported |
| 3 nm | 30% | Q2 2026 | Reported |
| 5 nm | 33% | Q2 2026 | Reported |
| 7 nm | 11% | Q2 2026 | Reported |
| 16/20 nm | 6% | Q2 2026 | Reported |
| 28 nm | 6% | Q2 2026 | Reported |
| 40/45 nm | 2% | Q2 2026 | Reported |
| 65 nm | 4% | Q2 2026 | Reported |
| 90–130 nm | 2% | Q2 2026 | Reported |
| ≥150 nm | 3% | Q2 2026 | Reported |
The interpretation is straightforward: a node can lead technologically before it dominates commercially. Existing designs and subsequent product generations can keep established processes economically relevant.
There is also a measurement trap. Expensive wafers can carry more revenue weight than their production volume suggests. TSMC’s mix cannot establish what percentage of all the world’s chips uses 2 nm. It is one foundry’s revenue disclosure. At the research cut-off, its Q3 earnings conference was scheduled for 15 October; this chart uses the published Q2 node breakdown.
The wider market: a powerful, uneven expansion
SIA reports global semiconductor sales of $795.6 billion in 2025. Its 5 October 2026 release puts August sales at $159.7 billion, up 144.3% year on year, with sales through August exceeding $1 trillion. The monthly series is a three-month moving average , not a raw single-month shipment total.
Different forecast vintages also need to remain separate. WSTS’s Spring 2026 outlook projects a $1.51 trillion market for the full year. SIA’s later October statement points to sales above $1.6 trillion. Neither is a completed 2026 result.
WSTS Spring 2026 · approximate year-on-year revenue growth, not chip-volume growth
Calendar 2026 forecast · Spring 2026 vintage
Solid bars show actual results; dashed bars show forecasts or guidance, not results. Source: WSTS · Spring 2026 forecast ↗
Data table & CSV
| Category | Value (%) | Period | Status |
|---|---|---|---|
| Memory | 250% | Calendar 2026 forecast · Spring 2026 vintage | Forecast |
| Logic | 37% | Calendar 2026 forecast · Spring 2026 vintage | Forecast |
| Microprocessors | 20% | Calendar 2026 forecast · Spring 2026 vintage | Forecast |
| Analog | 10% | Calendar 2026 forecast · Spring 2026 vintage | Forecast |
| Discrete | 8% | Calendar 2026 forecast · Spring 2026 vintage | Forecast |
| Sensors | 3% | Calendar 2026 forecast · Spring 2026 vintage | Forecast |
| Optoelectronics | 3% | Calendar 2026 forecast · Spring 2026 vintage | Forecast |
These differences matter for a node-focused investment thesis. Memory, logic and analog are separate product markets. Higher industry revenue does not establish how much came from extra production, changes in selling prices or a richer product mix. Nor does it show that every manufacturer has equal pricing power.
Why the AI boom still needs mature processes
SIA and Deloitte’s Powering AI report, published in June 2026, provides a useful system-level check. Its representative AI rack contains roughly 20,000 semiconductor dies packaged into more than 4,500 chips. These are different units: a packaged chip may contain several dies.
The study estimates that semiconductors account for roughly 95% of the rack’s content value. Yet 52% of its chips fall below $10 each, while only 3% sit above $1,000. The report also places most advanced-node dies in the compute tray; other trays depend heavily on more mature technologies.
These figures describe the report’s representative configuration, not every AI rack or the global node mix. Their analytical implication is that value concentration and operational importance are different: an inexpensive supporting component can still prevent an expensive system from operating.
There are clear commercial reasons to preserve multiple process generations. GlobalFoundries continues to develop its 22FDX platform for power-sensitive applications. Texas Instruments highlights 28–130 nm processes optimized for analog and embedded products. A suitable process must deliver the required electrical behaviour and economics; a smaller label alone does not establish suitability.
Capacity is another measure entirely
SEMI’s June 2025 public outlook projected capacity at 7 nm and below rising from approximately 850,000 to 1.4 million 300 mm wafers per month between 2024 and 2028. That gives a useful view of the planned physical expansion, but it is an older forecast, not a measurement of today’s installed or utilized capacity.
Global 7 nm and below · million 300 mm wafers per month
2024 baseline / 2025, 2026, 2028 forecasts
Solid bars show actual results; dashed bars show forecasts or guidance, not results. Source: SEMI · forecast published 25 June 2025 ↗ Filled: 2024 baseline. Dashed: June 2025 forecasts, not measured 2026 capacity. No 2027 observation is supplied.
Data table & CSV
| Category | Value (M) | Period | Status |
|---|---|---|---|
| 2024 | 0.85M | 2024 | Reported |
| 2025 | 0.982M | 2025 | Forecast |
| 2026 | 1.16M | 2026 | Forecast |
| 2028 | 1.4M | 2028 | Forecast |
Capacity is not production, and wafers are not packaged chips. Utilization (how much capacity is used), die area and yield (the share of usable output) all affect the number of working devices delivered. This is why the capacity chart and TSMC’s revenue chart should be read separately.
What to watch as the next nodes scale
For foundries, watch commercial execution. A technology announcement is a starting point. Evidence of customer adoption, production scale and attractive economics determines how much the node contributes to the business. TSMC’s emerging 2 nm revenue share provides one observable measure; equivalent disclosures are not consistently available across competitors.
For equipment suppliers, watch the manufacturing changes. ASML’s extreme ultraviolet (EUV) lithography systems, which use light to pattern circuits, are relevant to advanced-node manufacturing. But a node label alone does not specify the complete equipment bill or the timing of orders. The investment question is how customers translate their process and capacity plans into spending, then sustain utilization.
For chip designers, watch system economics. More capable logic can lose much of its practical advantage if memory, communication or power delivery constrains the system. Conversely, effective integration can make a product built on an established node highly competitive.
For suppliers of supporting chips, watch content and pricing separately. Being essential to AI infrastructure does not automatically imply high margins. The relevant questions are how many devices a system requires, whether customers can substitute them, and how much capacity is available.
The advance towards 1 nm will remain a defining engineering story. The investable opportunity is distributed more widely: across the new processes, the established nodes that remain economical, and the technologies that connect them into useful systems. The smallest number is a starting point for analysis, not its conclusion.
AW
Show / hide sources
Primary sources
- Intel · Explaining Common Chip Terms ↗ · 9 March 2026
9 March 2026
- TSMC · 2025 Annual Report ↗ · technology status and roadmap
technology status and roadmap
Direct verification unavailable: the 2025 annual-report page could not be accessed. Related TSMC press releases corroborate portions of the roadmap; the precise N2P/A16 window still requires editorial checking.
- TSMC · Q2 2026 Management Report ↗ · 16 July 2026
16 July 2026 · p. 2
- Intel · Panther Lake technology presentation ↗ · compute tile on 18A
compute tile on 18A
- Samsung · Exynos 2600 ↗ · official product specifications
official product specifications
- TSMC · A14 technology announcement ↗ · 24 April 2025
24 April 2025
- TSMC · A13 / A12 / N2U announcement ↗ · 23 April 2026
23 April 2026
- imec · CMOS scaling ↗ · research directions towards 1 nm
research directions towards 1 nm
- Apple · iPhone 18 Pro and A20 Pro ↗ · September 2026
September 2026
- Apple · M4 announcement ↗ · 7 May 2024
7 May 2024
- NVIDIA · Blackwell platform announcement ↗ · 18 March 2024
18 March 2024
- AMD · Ryzen 9 7950X ↗ · CPU core and I/O die specifications
CPU core and I/O die specifications
- AMD · Second-generation EPYC announcement ↗ · 7 August 2019
7 August 2019
- GlobalFoundries · 22FDX platform advancements ↗ · 27 September 2023
27 September 2023
- Texas Instruments · Capital Management Call Presentation 2026 ↗
Web page; publication date not provided in the supplied manuscript.
Verified via a text-extraction copy of the capital-management presentation, dated 24 February 2026; not a product-specific datasheet.
- Micron · Inside 1-alpha DRAM ↗ · explanation of 10 nm-class nomenclature
explanation of 10 nm-class nomenclature
Micron’s 10 nm-class terminology was verified. This source does not support the separate TSMC N12/N3 HBM4 base-die assertion in the supplied manuscript.
- TSMC · Q3 2026 results calendar ↗ · conference scheduled 15 October
conference scheduled 15 October
- SIA · State of the Industry ↗ · 27 July 2026
27 July 2026
- SIA / WSTS · August sales release ↗ · 5 October 2026
5 October 2026
- WSTS · Spring 2026 market forecast ↗ · accessed 13 October 2026
accessed 13 October 2026
- SIA / Deloitte · Powering AI ↗ · June 2026
June 2026 · pp. 5, 35–36
- SEMI · 300mm Fab Outlook public release ↗ · 25 June 2025
25 June 2025
Verified against an archived copy of SEMI’s 25 June 2025 release; the live page restricted automated access. The 2025 and 2026 values are explicit forecasts, not interpolations.
- ASML · EUV lithography systems ↗ · technology overview
technology overview
Data, definitions & methodology
Research cut-off: 13 Oct 2026. Publication date is separate from the research cut-off.
The October release uses a revised August 2025 comparison of $65.4 billion. Its year-on-year calculation should not be recomputed using an older release’s unrevised comparison.
This article combines public primary sources. Company performance targets are attributed; forecasts retain their publication dates. Interpretations are editorial analysis. No global market-share distribution by individual process node is inferred from the available sources.
“Advanced” is not standardized across sources: SEMI’s capacity series covers 7 nm and below. The SIA/Deloitte rack study uses its own logic and memory classifications, including a sub-10 nm definition for advanced logic. The categories should not be merged.
SIA and SEMI are different industry associations. SIA/WSTS supports the market discussion; SEMI supports the capacity chart. SIA/Deloitte supports the rack analysis.
The SIA/Deloitte PDF and its promotional web pages state different horizons and scopes for some aggregate data-center investment figures. Those investment totals are deliberately excluded here. The rack estimates are also a modeled reference configuration, not a census.
SEMI’s headline percentage is based on underlying precision; the rounded endpoints shown here should not be used to claim an exactly matching growth rate.
Chart 1 percentages total 100%; the four 7 nm-and-smaller categories total 77%. Silicon Analytica calculations: 3 + 30 + 33 + 11 = 77; remaining categories total 23. These calculations apply only to the reported TSMC wafer-revenue denominator.
All monetary comparisons are stated in US dollars; no foreign-currency conversion is used. The cover is an AI-generated editorial illustration, not evidence of a named facility or an individual process node.
Source review: all three chart datasets match the cited primary material, including SEMI’s explicit 2025 and 2026 forecasts. The SIA/Deloitte price buckets are in Figure 19, pp. 35–36. Primary product mappings were checked; the TSMC 2025 annual report remained inaccessible and the supplied HBM4 N12/N3 mapping lacks a traceable source. The article stays unpublished pending these checks.
| Category | Value | Period | Status |
|---|---|---|---|
| 2 nm | 3% | Q2 2026 | Reported |
| 3 nm | 30% | Q2 2026 | Reported |
| 5 nm | 33% | Q2 2026 | Reported |
| 7 nm | 11% | Q2 2026 | Reported |
| 16/20 nm | 6% | Q2 2026 | Reported |
| 28 nm | 6% | Q2 2026 | Reported |
| 40/45 nm | 2% | Q2 2026 | Reported |
| 65 nm | 4% | Q2 2026 | Reported |
| 90–130 nm | 2% | Q2 2026 | Reported |
| ≥150 nm | 3% | Q2 2026 | Reported |
| Category | Value | Period | Status |
|---|---|---|---|
| Memory | 250% | Calendar 2026 forecast · Spring 2026 vintage | Forecast |
| Logic | 37% | Calendar 2026 forecast · Spring 2026 vintage | Forecast |
| Microprocessors | 20% | Calendar 2026 forecast · Spring 2026 vintage | Forecast |
| Analog | 10% | Calendar 2026 forecast · Spring 2026 vintage | Forecast |
| Discrete | 8% | Calendar 2026 forecast · Spring 2026 vintage | Forecast |
| Sensors | 3% | Calendar 2026 forecast · Spring 2026 vintage | Forecast |
| Optoelectronics | 3% | Calendar 2026 forecast · Spring 2026 vintage | Forecast |
| Category | Value | Period | Status |
|---|---|---|---|
| 2024 | 0.85M | 2024 | Reported |
| 2025 | 0.982M | 2025 | Forecast |
| 2026 | 1.16M | 2026 | Forecast |
| 2028 | 1.4M | 2028 | Forecast |
For information and educational purposes only. This research is not personalized investment advice or a recommendation to buy or sell a security.
Silicon Analytica